BN Business News
Añadir empresa →
Esta traducción se está preparando. Mientras tanto, mostramos temporalmente la versión original en inglés.

Regulación y derecho · 3/9/20251 min de lectura

Notice of Final Federal Agency Actions on Proposed Transportation Project in Utah

Traducción automática local · Idioma original de la fuente

Resumen

The FHWA, on behalf of the Utah Department of Transportation (UDOT), is issuing this notice to announce actions taken by UDOT and other Federal agencies that are final agency actions. These actions relate to proposed transportation improvements on Interstate 84 (I-84) and State Route 167 (SR-167) in Mountain Green, Morgan County, Utah. The proposed action includes the addition of a full access diamond interchange at I-84 tying into an extension of Trappers Loop Road; the addition of a four-way, signalized intersection at SR-167/Old Highway Road; the addition of a shared use path on the Trappers Loop Road extension; and the closure of the existing I-84/SR-167 interchange.

Idioma original de la fuente: Federal Register — All DocumentsAbrir el comunicado original →