BN Business News
Añadir empresa →
Esta traducción se está preparando. Mientras tanto, mostramos temporalmente la versión original en inglés.

Regulación y derecho · 30/8/20191 min de lectura

Notice of Final Federal Agency Action on the I-10 Mobile River Bridge and Bayway Project in Alabama

Traducción automática local · Idioma original de la fuente

Resumen

This notice announces actions taken by the FHWA that are final. The action relates to the proposed project to increase the capacity of Interstate Route 10 (I-10) by constructing a new six-lane bridge across the Mobile River and replacing the existing four-lane I- 10 bridges across Mobile Bay with eight lanes above the 100-year storm elevation. The proposed project is located in Mobile and Baldwin Counties, Alabama. Those actions grant approvals for the project.

Idioma original de la fuente: Federal Register — All DocumentsAbrir el comunicado original →