BN Business News
Añadir empresa →
Esta traducción se está preparando. Mientras tanto, mostramos temporalmente la versión original en inglés.

Regulación y derecho · 31/8/20181 min de lectura

Notice of Availability of the Final Missouri River Recovery Management Plan and Environmental Impact Statement

Traducción automática local · Idioma original de la fuente

Resumen

The Kansas City and Omaha Districts of the U.S. Army Corps of Engineers (USACE), in cooperation with the U.S. Fish and Wildlife Service (USFWS), have developed the Missouri River Recovery Management Plan and Environmental Impact Statement (MRRMP-EIS). This document is a programmatic assessment of major federal actions necessary to avoid a finding of jeopardy to the pallid sturgeon (Scaphirhynchus albus), interior least tern (Sterna antillarum athalassos), and the Northern Great Plains piping plover (Charadrius melodus) caused by operation of the Missouri River Mainstem System and the Kansas River Reservoir System and operation and maintenance of the Missouri River Bank Stabilization and Navigation Project (BSNP) in accordance with the Endangered Species Act (ESA) of 1973, as amended. This programmatic document also assesses the Missouri River BSNP fish and wildlife mitigation project described in the 2003 Record of Decision (ROD) and authorized by the Water Resources Development Act (WRDA) of 1986, 1999, and 2007 as it relates to endangered species.

Idioma original de la fuente: Federal Register — All DocumentsAbrir el comunicado original →