Regulación y derecho · 6/10/20051 min de lectura

Safety Modifications for Folsom Dam and Appurtenant Structures (Folsom Safety of Dams Project)- Sacramento, El Dorado, and Placer Counties, CA

Traducción automática local · Idioma original de la fuente

Resumen

Pursuant to Section 102(2)(C) of the National Environmental Policy Act of 1969 (NEPA), the Bureau of Reclamation (Reclamation) intends to prepare an EIS for the implementation of the safety modifications for Folsom Dam and Appurtenant Structures (Folsom Safety of Dams Project). Reclamation seeks to improve public safety by modifying Folsom Facilities and its appurtenant structures (Folsom Facilities) to mitigate issues identified in previous and ongoing safety evaluations. Studies are being conducted by Reclamation to identify alternatives (modifications) to address these conditions. Engineering, Economic, and Environmental studies are being conducted to help determine reasonable design alternatives. Information gathered from the EIS process will be used in conjunction with engineering and economic principles to determine preferred alternatives.

Idioma original de la fuente: Federal Register — All DocumentsAbrir el comunicado original →