Esta traducción se está preparando. Mientras tanto, mostramos temporalmente la versión original en inglés.
Regulación y derecho · 31/10/20051 min de lectura
Certain Stainless Steel Butt-Weld Pipe Fittings from Taiwan: Notice of Extension of Time Limit for the Final Results of Antidumping Duty Administrative Review
Traducción automática local · Idioma original de la fuente
Resumen
The Department of Commerce (the Department) is extending the time limit for the final results of the administrative review of the antidumping duty order on certain stainless steel butt-weld pipe fittings from Taiwan. The period of review is June 1, 2003, through May 31, 2004. This extension is made pursuant to section 751(a)(3)(A) of the Tariff Act of 1930, as amended by the Uruguay Round Agreements Act (the Act).
Idioma original de la fuente: Federal Register — All DocumentsAbrir el comunicado original →