Comercio internacional · 28/10/20041 min de lectura
Stainless Steel Plate in Coils from Belgium; Extension of Time Limit for the Final Results of Sunset Review of Countervailing Duty Order
Traducción automática local · Idioma original de la fuente
Resumen
The Department of Commerce ("the Department") is extending the time limit for its final results in the sunset review of the countervailing duty order on stainless steel plate in coils ("SSPC") Belgium. The Department intends to issue the final results of this sunset review on or about October 28, 2004.