BN Business News
Añadir empresa →
Esta traducción se está preparando. Mientras tanto, mostramos temporalmente la versión original en inglés.

Comercio internacional · 5/11/20041 min de lectura

Stainless Steel Bar From France: Notice of Extension of Time Limit for Preliminary Results in Antidumping Duty Administrative Review

Traducción automática local · Idioma original de la fuente

Resumen

The Department of Commerce (the Department) is extending the time limit for the preliminary results of the administrative review of the antidumping duty order on stainless steel bar from France, which covers the period March 1, 2003, through February 29, 2004.

Idioma original de la fuente: Federal Register — Department of CommerceAbrir el comunicado original →