BN Business News
Añadir empresa →
Esta traducción se está preparando. Mientras tanto, mostramos temporalmente la versión original en inglés.

Mercado laboral · 2/3/20041 min de lectura

Overhead and Gantry Cranes Standard (29 CFR 1910.179); Extension of the Office of Management and Budget's (OMB) Approval of Information-Collection (Paperwork) Requirements

Traducción automática local · Idioma original de la fuente

Resumen

OSHA solicits comments concerning its proposal to extend OMB approval of the Information Collection requirements contained in the Overhead and Gantry Cranes standard. (29 CFR 1910.179). The paperwork provisions of this standard specify requirements for: Marking the rated load of cranes; preparing, maintaining, and disclosing certification records of hook, hoist chain, and rope inspections and load test reports. The purpose of the requirements is to provide information to employees concerning tests and inspection of critical components of the crane and to provide information about the lifting limits of the crane. This information will be useful in preventing death and serious injuries by ensuring that employees operate overhead and gantry cranes within the rated loads marked on the equipment.

Idioma original de la fuente: Federal Register — Occupational Safety and Health AdministrationAbrir el comunicado original →