Esta traducción se está preparando. Mientras tanto, mostramos temporalmente la versión original en inglés.
Regulación y derecho · 1/11/20021 min de lectura
Mechanical Transfer Presses from Japan: Extension of Time Limit for Preliminary Results of Antidumping Duty Administrative Review, and Preliminary Rescission, in Part, of Antidumping Duty Administrative Review
Traducción automática local · Idioma original de la fuente
Resumen
The Department of Commerce is extending the time limit for the preliminary results of the administrative review of mechanical transfer presses (MTPs) from Japan until no later than February 28, 2003. The period of review is February 1, 2001 through January 31, 2002. This extension is made pursuant to section 751(a)(3)(A) of the Tariff Act of 1930, as amended (the Act).
Idioma original de la fuente: Federal Register — All DocumentsAbrir el comunicado original →