BN Business News
Añadir empresa →
Esta traducción se está preparando. Mientras tanto, mostramos temporalmente la versión original en inglés.

Regulación y derecho · 3/10/20001 min de lectura

East Bay Municipal Utility District Supplemental Water Supply Project

Traducción automática local · Idioma original de la fuente

Resumen

Pursuant to the National Environmental Policy Act (NEPA) and the California Environmental Quality Act, the Bureau of Reclamation (Reclamation) and the East Bay Municipal Utility District (EBMUD) have prepared a joint REIR/SEIS for the East Bay Municipal Utility District Supplemental Water Supply Project. Reclamation and EBMUD originally prepared a draft environmental impact report/draft environmental impact statement (DEIR/DEIS) for the proposed project in November 1997. The proposed action is for EBMUD to obtain a supplemental water supply to help reduce customer deficiencies during droughts, and provide system reliability and to allow EBMUD to use its existing contract with Reclamation for delivery of water from the American River.

Idioma original de la fuente: Federal Register — All DocumentsAbrir el comunicado original →