BN Business News
Añadir empresa →
Esta traducción se está preparando. Mientras tanto, mostramos temporalmente la versión original en inglés.

Regulación y derecho · 1/12/20001 min de lectura

Cotton Shop Towels from Pakistan: Extension of Time Limit for Preliminary Results of Countervailing Duty Administrative Review

Traducción automática local · Idioma original de la fuente

Resumen

The Department of Commerce (the Department) is extending the time limit for the preliminary results of the administrative review of the countervailing duty order on cotton shop towels from Pakistan. This review covers eleven manufacturers/producers and the period January 1, 1999, to December 31, 1999.

Idioma original de la fuente: Federal Register — All DocumentsAbrir el comunicado original →