BN Business News
Añadir empresa →
Esta traducción se está preparando. Mientras tanto, mostramos temporalmente la versión original en inglés.

Regulación y derecho · 7/12/19981 min de lectura

Certain Fresh Cut Flowers From Colombia: Extension of Time Limit of Antidumping Administrative Review

Traducción automática local · Idioma original de la fuente

Resumen

The Department of Commerce is extending the time limit for the preliminary results in the administrative review of the antidumping order on certain fresh cut flowers from Colombia, covering the period March 1, 1997, through February 28, 1998, since it is not practicable to complete the review within the time limits mandated by section 751(a)(3)(A) of the Tariff Act of 1930, as amended, 19 U.S.C. 1675 (a)(3)(A).

Idioma original de la fuente: Federal Register — All DocumentsAbrir el comunicado original →