Briefings on Preliminary Findings of 2012 National Electric Transmission Congestion Study
Traducción automática local · Idioma original de la fuente
Resumen
Section 216(a)(1) of the Federal Power Act (FPA) requires the Department of Energy (Department or DOE) to complete a study of electric transmission congestion every three years. DOE previously issued the 2006 and 2009 studies and is currently developing the 2012 study. DOE, as part of the consultation process, will host three webinars in August 2012 to receive input and suggestions concerning the preliminary findings of the study. After the webinars, DOE will release a draft of the study for public comment. After reviewing and considering the comments received, DOE will publish a final version of the study.