BN Business News
Añadir empresa →
Esta traducción se está preparando. Mientras tanto, mostramos temporalmente la versión original en inglés.

Energía y medio ambiente · 30/8/20131 min de lectura

Notice of Intent To Prepare an Environmental Impact Statement for the Blythe Solar Power Project, Riverside County, CA

Traducción automática local · Idioma original de la fuente

Resumen

In compliance with the National Environmental Policy Act of 1969, as amended (NEPA), and the Federal Land Policy and Management Act of 1976, as amended (FLPMA), the Bureau of Land Management (BLM) Palm Springs/South Coast Field Office, Palm Springs, California, intends to prepare an Environmental Impact Statement (EIS) considering proposed amendments to the Blythe Solar Power Project (BSPP) right-of-way (ROW) grant (CACA-048811). The amendments include a change in technology, reduced project footprint, and operation by a different project owner. By this notice, the BLM is announcing the beginning of the scoping process to solicit public comments and identify issues for the EIS.

Idioma original de la fuente: Federal Register — Interior DepartmentAbrir el comunicado original →