BN Business News
Unternehmen hinzufügen →
Diese Übersetzung wird noch vorbereitet. Bis dahin zeigen wir vorübergehend die englische Originalversion.

Energie & Umwelt · 22.7.20161 Min. Lesezeit

Virgil C. Summer Nuclear Station, Units 2 and 3; South Carolina Electric & Gas Company; South Carolina Public Service Authority; Increased Concrete Thickness Tolerance for Column Line J-1 and J-2 Walls Above 66′6″

Lokale automatische Übersetzung · Originalsprache der Quelle

Zusammenfassung

The U.S. Nuclear Regulatory Commission (NRC) is granting an exemption to allow a change to the certification information of Tier 1 of the generic design control document (DCD) and issuing License Amendment No. 47 to Combined Licenses (COL), NPF-93 and NPF-94. The COLs were issued to the South Carolina Electric & Gas Company (SCE&G) and the South Carolina Public Service Authority (together called the licensee) in March 2012, for the construction and operation of the Virgil C. Summer Nuclear Station (VCSNS), Units 2 and 3, located in Fairfield County, South Carolina. The granting of the exemption allows the changes to Tier 1 information requested in the license amendment request. Because the acceptability of the exemption was determined in part by the acceptability of the amendment, the exemption and amendment are being issued concurrently.

Originalsprache der Quelle: Federal Register — Nuclear Regulatory CommissionOriginalquelle öffnen →

Weitere Themen

Business-Analysen →