BN Business News
Unternehmen hinzufügen →
Diese Übersetzung wird noch vorbereitet. Bis dahin zeigen wir vorübergehend die englische Originalversion.

Regulierung & Recht · 17.12.20071 Min. Lesezeit

Energy Conservation Program for Consumer Products: Decision and Order Granting a Waiver to Fujitsu General From the Department of Energy Residential Central Air Conditioner and Heat Pump Test Procedure [Case No. CAC-010]

Lokale automatische Übersetzung · Originalsprache der Quelle

Zusammenfassung

This notice publishes the Department of Energy's Decision and Order in Case No. CAC-010, which grants a Waiver to Fujitsu General Limited (Fujitsu) from the existing Department of Energy (DOE) residential central air conditioner and heat pump test procedure for specified Airstage Variable Refrigerant Flow (VRF) multi-split products. As a condition of this waiver, Fujitsu must test and rate its Airstage multi-split products according to the alternate test procedure set forth in this notice.

Originalsprache der Quelle: Federal Register — All DocumentsOriginalquelle öffnen →

Weitere Themen

Business-Analysen →