BN Business News
Unternehmen hinzufügen →
Diese Übersetzung wird noch vorbereitet. Bis dahin zeigen wir vorübergehend die englische Originalversion.

Regulierung & Recht · 4.9.20012 Min. Lesezeit

Unregulated Contaminant Monitoring Regulation for Public Water Systems; Amendment to the List 2 Rule and Partial Delay of Reporting of Monitoring Results

Lokale automatische Übersetzung · Originalsprache der Quelle

Zusammenfassung

The Safe Drinking Water Act (SDWA), as amended in 1996, requires the U.S. Environmental Protection Agency to establish criteria for a program to monitor unregulated contaminants and to publish a list of contaminants to be monitored. In fulfillment of this requirement, EPA published Revisions to the Unregulated Contaminant Monitoring Regulation (UCMR) for public water systems on September 17, 1999 (64 FR 50556), March 2, 2000 (65 FR 11372) and January 11, 2001 (66 FR 2273), which included lists of contaminants for which monitoring was required or would be required in the future. EPA is proposing to correct an omission in the January 11, 2001, List 2 UCMR concerning laboratory certification. This correction will automatically approve laboratories of public water systems, that are certified to conduct compliance monitoring using Method 515.3, to also use Method 515.4 for UCMR analyses. Additionally, EPA is delaying requirements for the electronic reporting of unregulated contaminant monitoring results until its electronic reporting system is ready to accept data. The January 11, 2001, List 2 UCMR requires certain public water systems to start reporting the results of their unregulated

Originalsprache der Quelle: Federal Register — All DocumentsOriginalquelle öffnen →

Weitere Themen

Business-Analysen →