International trade · 10/06/2011Updated: 10/17/2026 · 1 min read
U.S. Extends Timeframe for Preliminary Results of Antidumping Review on Mexican Steel Wire Rod
Summary
The U.S. Trade Representative's office has extended the deadline for preliminary results of the fifth antidumping duty review on carbon and certain alloy steel wire rod imported from Mexico, which was originally set to be released on October 17, 2023.