International trade · 31/10/2011Updated: 10/17/2026 · 1 min read
Italy Extends Timeframe for Preliminary Results of Antidumping Review on Stainless Steel Pipe Fittings
Summary
The Italian government has extended the deadline for preliminary results of an antidumping duty administrative review on stainless steel butt-weld pipe fittings imported from Italy, affecting companies such as FLSmidth A/S (FLS) and Valmet Ltd. (VALMT).