Energy & environment · 24/10/20261 min read
The regulatory guide: Acceptability of ASME OM-2 Code, Requirements for Testing Components at Nuclear Facilities
Summary
The U.S. Nuclear Regulatory Commission (NRC) is confirming the effective date of 18 August 2026, for Revision 0 of Regulatory Guide (RG) 1. 220, "Acceptability of ASME OM-2 Code, Component Testing Requirements at Nucl...