International trade · 04/05/2010Updated: 10/17/2026 · 1 min read
U.S. Extends Timeframe for Preliminary Results of Antidumping Investigation into Indian Welded Carbon Steel Pipes and Tubes
Summary
The U.S. Trade Representative's office has extended the deadline for preliminary results of an antidumping duty administrative review into Indian welded carbon steel standard pipes and tubes, which was originally set to be released on October 17, 2023