Business · 19/02/2015Updated: 10/17/2026 · 1 min read
Basin Electric Power Cooperative Extends Public Comment Period for Big Bend to Witten Transmission Line Project Environmental Assessment
Summary
The Rural Utilities Service is extending the public comment period for an Environmental Assessment related to a proposed 70-mile transmission line project by Basin Electric Power Cooperative, which involves a new transmission line, switchyard, and substation, and requires financial assistance from the Rural Utilities Service.