Energia i gospodarka · 13/09/2013
Colorado River Storage Project-Rate Order No. WAPA-161
This action is to extend the existing Salt Lake City Area Integrated Projects (SLCA/IP) Firm Power Rate and the Colorado River Storage Project (CRSP) Transmission and Ancillary Services Rates through September 30, 2015. The existing SLCA/IP Firm Power Rate and CRSP Transmission and Ancillary Services Rates are set to expire September 30, 2013.