Bezpieczeństwo i regulacje · 06/05/2013
Proposal To Replace the Existing Movable I-5 Bridge Across the Columbia River With a Fixed Multi-use Bridge Which Will Accommodate Vehicular, Light Rail, Pedestrian and Bicycle Traffic and Will Be Called the Columbia River Crossing; Application Availability
The Coast Guard, under its General Bridge Act of 1946 permit authority, announces the availability of a bridge permit application submitted by Columbia River Crossing (CRC). CRC's proposed project includes a new fixed bridge that will cross the Columbia River adjacent to the existing Interstate 5 bridge connecting Portland, Oregon and Vancouver, Washington. This new fixed bridge will provide 116 feet of vertical clearance above Columbia River Datum to accommodate waterway users. In addition to vehicular, bicycle, and pedestrian traffic, the proposed bridge will carry a light rail line that will extend Portland's light rail service into Vancouver, Washington. Through this notice, the Coast Guard is soliciting your input on the potential impacts to navigation as a result of the proposed project in order to determine whether the proposal meets the reasonable needs of navigation.