Regulation & law · 27/11/2006Updated: 10/17/2026 · 1 min read
U.S. Extends Timeframe for Preliminary Results of Antidumping Review on Mexican Steel Pipe and Tube
Summary
The U.S. Trade Representative's office has extended the deadline for preliminary results of an antidumping duty review on imported circular welded non-alloy steel pipe and tube from Mexico, which was originally set for October 2023.
Original source language: Federal Register — All DocumentsOpen original release →