Energy & environment · 04/11/2010Updated: 10/17/2026 · 1 min read
EPA Grants Waiver to Town of Taos for Non-US Made Crane Railing Under ARRA
Summary
The EPA Region 6 has granted a waiver to the Town of Taos, NM, allowing it to purchase crane railing from foreign manufacturers for its wastewater treatment plant expansion project, as no US manufacturer can meet the required technical specifications