Bezpieczeństwo i regulacje · 11.06.2013
Drawbridge Operation Regulation; Elizabeth River, Eastern Branch, Norfolk, VA
The Coast Guard has issued a temporary deviation from the operating schedule that governs the draw of the Norfolk Southern 5 Railroad Bridge, across the Elizabeth River Eastern Branch, mile 1.1, Norfolk, VA. This deviation is necessary to facilitate thermite welding on rail joints on the Norfolk Southern 5 Railroad drawbridge. This temporary deviation allows the drawbridge to remain in the closed to navigation position.