Bezpieczeństwo i regulacje · 16.08.2013
Drawbridge Operation Regulation; Elizabeth River, Eastern Branch, Norfolk, VA
The Coast Guard has issued a temporary deviation from the operating schedule that governs the draw of the Norfolk Southern 5 Railroad Bridge, across the Elizabeth River Eastern Branch, mile 1.1, at Norfolk, VA. This deviation is necessary to facilitate replacing the broken tread plates and shimming the remaining tread plates to the proper elevation on the Norfolk Southern 5 Railroad drawbridge. There are a total of 10 tread plates that need to be replaced. This temporary deviation allows the drawbridge to remain in the closed to navigation position.