BN Business News
Add your company to Business Communicator →

Bezpieczeństwo i regulacje · 30.10.2013

Drawbridge Operation Regulation; Upper Mississippi River, Hannibal, MO

The Coast Guard has issued a temporary deviation from the operating schedule that governs the Hannibal Railroad Drawbridge across the Upper Mississippi River, mile 309.9, at Hannibal, Missouri. The deviation is necessary to allow the bridge owner time to replace critical control components that are essential to the continued safe operation of the drawbridge. The work is scheduled in the winter, when the impact on navigation is minimal, instead of scheduling the work at other times in the year, when river traffic is prevalent. This deviation allows the bridge to remain in the closed-to-navigation position for 39 days.

Source: Federal Register — Homeland SecurityOpen original release →