BN Business News
أضف شركتك →
تجري حاليًا ترجمة هذا المقال. نعرض مؤقتًا النسخة الأصلية باللغة الإنجليزية.

التنظيم والقانون · 30‏/8‏/20221 دقائق للقراءة

Notice of Interim Approval of Rate Schedules for the Georgia-Alabama-South Carolina Projects

ترجمة آلية محلية · اللغة الأصلية للمصدر

الملخص

The Administrator for the Southeastern Power Administration (Southeastern) has confirmed and approved, on an interim basis, rate schedules SOCO-1-G, SOCO-2-G, SOCO-3-G, SOCO-4-G, Duke-1-G, Duke-2-G, Duke-3-G, Duke-4-G, Santee-1-G, Santee-2-G, Santee-3-G, Santee-4-G, SCE&G-1-G, SCE&G-2-G, SCE&G-3-G, SCE&G-4-G, Pump-1-A, and Replacement- 1. These rate schedules are applicable to Southeastern power sold to existing preference customers in Alabama, Florida, Georgia, Mississippi, North Carolina, and South Carolina. The rate schedules are approved on an interim basis through September 30, 2027, and are subject to confirmation and approval by the Federal Energy Regulatory Commission (FERC) on a final basis.

اللغة الأصلية للمصدر: Federal Register — All Documentsافتح البيان الأصلي →

استكشف الموضوعات

تحليلات الأعمال →