BN Business News
أضف شركتك →
تجري حاليًا ترجمة هذا المقال. نعرض مؤقتًا النسخة الأصلية باللغة الإنجليزية.

التنظيم والقانون · 31‏/8‏/20211 دقائق للقراءة

Loveland Area Projects, Western Area Colorado Missouri Balancing Authority, and Colorado River Storage Project-Rate Order No. WAPA-196

ترجمة آلية محلية · اللغة الأصلية للمصدر

الملخص

The extension of the existing Loveland Area Projects (LAP) transmission and LAP, Western Area Colorado Missouri Balancing Authority (WACM), and Colorado River Storage Project (CRSP) ancillary services formula rates has been confirmed, approved, and placed into effect on an interim basis. The existing formula rates under Rate Schedules L-NT1 (network), L-FPT1 (firm point-to-point), L-NFPT1 (non- firm point-to-point), L-UU1, (unreserved use), L-AS1 (scheduling and dispatch), L-AS2 (reactive supply and voltage control (VAR) support), L-AS3 (regulation), L-AS5 (spinning reserves), and L-AS6 (supplemental reserves) are set to expire on September 30, 2021. This rate extension makes no changes to the existing formula rates and extends them through September 30, 2024.

اللغة الأصلية للمصدر: Federal Register — All Documentsافتح البيان الأصلي →

استكشف الموضوعات

تحليلات الأعمال →