BN Business News
أضف شركتك →
تجري حاليًا ترجمة هذا المقال. نعرض مؤقتًا النسخة الأصلية باللغة الإنجليزية.

التنظيم والقانون · 12‏/11‏/20192 دقائق للقراءة

Air Plan Approval and Designation of Areas; FL; Redesignation of the Hillsborough County 2010 1-Hour Sulfur Dioxide Nonattainment Area to Attainment

ترجمة آلية محلية · اللغة الأصلية للمصدر

الملخص

In a letter dated June 7, 2018, the State of Florida, through the Florida Department of Environmental Protection (FDEP), submitted a request for the Environmental Protection Agency (EPA) to redesignate the Hillsborough County sulfur dioxide (SO 2 ) nonattainment area (hereinafter referred to as the "Hillsborough County Area" or "Area") to attainment for the 2010 1- hour SO 2 primary national ambient air quality standard (NAAQS) and to approve an accompanying state implementation plan (SIP) revision containing a maintenance plan for the Area. Through a letter dated April 16, 2019, FDEP submitted a revision to the June 7, 2018, redesignation request and SIP revision asking EPA to incorporate certain conditions into the SIP from a recent permit revision applicable to the Tampa Electric Company--Big Bend Station (Big Bend) power plant. EPA is taking final action: To determine that the Hillsborough County Area attained the 2010 1-hour SO 2 NAAQS by its applicable attainment date of October 4, 2018; to approve the SIP revision containing the State's plan for maintaining attainment of the 2010 1-hour SO 2 standard and to incorporate the maintenance plan into the SIP; to redesignate the Hi

اللغة الأصلية للمصدر: Federal Register — All Documentsافتح البيان الأصلي →

استكشف الموضوعات

تحليلات الأعمال →