BN Business News
أضف شركتك →
تجري حاليًا ترجمة هذا المقال. نعرض مؤقتًا النسخة الأصلية باللغة الإنجليزية.

الطاقة والبيئة · 16‏/12‏/20161 دقائق للقراءة

Notice of Availability of the Record of Decision for the Energy Gateway South Transmission Project and Approved Land Use Plan Amendments in Colorado, Utah, and Wyoming

ترجمة آلية محلية · اللغة الأصلية للمصدر

الملخص

The Bureau of Land Management (BLM) announces the availability of the Record of Decision (ROD) for the Energy Gateway South Transmission Project (Project) and approved land use plan amendments of the Rawlins, Little Snake, Pony Express, Price, and Vernal Resource Management Plans (RMPs). The ROD constitutes the BLM's final decision regarding: granting a right-of-way to PacifiCorp (doing business as Rocky Mountain Power) to construct and operate an extra-high voltage alternating-current transmission system; and amending certain BLM land use plans. The decisions are effective immediately.

اللغة الأصلية للمصدر: Federal Register — Interior Departmentافتح البيان الأصلي →

استكشف الموضوعات

تحليلات الأعمال →