BN Business News
أضف شركتك →
تجري حاليًا ترجمة هذا المقال. نعرض مؤقتًا النسخة الأصلية باللغة الإنجليزية.

التنظيم والقانون · 4‏/9‏/20151 دقائق للقراءة

Notice of Intent To Prepare Draft Environmental Impact Statement (EIS) for the Rebuild by Design Hudson River Project: Resist, Delay, Store, Discharge in the City of Hoboken, Township of Weehawken and City of Jersey City, New Jersey

ترجمة آلية محلية · اللغة الأصلية للمصدر

الملخص

This provides notice that the New Jersey Department of Environmental Protection (NJDEP) intends to prepare an Environmental Impact Statement (EIS) for the Rebuild by Design Hudson River Project: Resist, Delay, Store, Discharge (the Project) in the City of Hoboken, Township of Weehawken, and City of Jersey City, New Jersey. The Proposed Project was developed as a concept through the Hurricane Sandy Rebuilding Task Force's Rebuild by Design (RBD) program, a design competition to promote the development of resiliency in the Sandy- affected region. The Proposed Project will consist of a four-part comprehensive strategy, including (1) hard infrastructure and soft landscape for coastal defense (Resist); (2) policy recommendations, guidelines and urban infrastructure to slow storm water runoff (Delay); (3) green and/ or grey infrastructure improvements to allow for greater storage of excess rainwater (Store); and (4) water pumps and alternative routes to support drainage (Discharge). The proposed project will occur throughout the City of Hoboken, with linkages to the adjoining communities in the Township of Weehawken and City of Jersey City. The Proposed Project was selected by HUD throug

اللغة الأصلية للمصدر: Federal Register — All Documentsافتح البيان الأصلي →

استكشف الموضوعات

تحليلات الأعمال →