BN Business News
أضف شركتك →
تجري حاليًا ترجمة هذا المقال. نعرض مؤقتًا النسخة الأصلية باللغة الإنجليزية.

الطاقة والبيئة · 30‏/9‏/20141 دقائق للقراءة

Notice of Availability and Notice of Public Hearings for the Draft Environmental Impact Statement/Environmental Impact Report for Long-Term Water Transfers, Central Valley and Bay Area, California

ترجمة آلية محلية · اللغة الأصلية للمصدر

الملخص

The Bureau of Reclamation and the San Luis & Delta-Mendota Water Authority have made available for public review and comment the Long-Term Water Transfers Draft Environmental Impact Statement/ Environmental Impact Report (EIS/EIR). The Draft EIS/EIR addresses water transfers to Central Valley Project (CVP) contractors south of the Delta and in the San Francisco Bay area from CVP and non-CVP sources from north of the Delta using Delta pumps (both CVP and State Water Project (SWP) facilities). Water transfers would occur through various methods such as groundwater substitution, cropland idling, reservoir release, and conservation, and would include individual and multiyear transfers from 2015 through 2024.

اللغة الأصلية للمصدر: Federal Register — Interior Departmentافتح البيان الأصلي →

استكشف الموضوعات

تحليلات الأعمال →