BN Business News
أضف شركتك →
تجري حاليًا ترجمة هذا المقال. نعرض مؤقتًا النسخة الأصلية باللغة الإنجليزية.

الطاقة والبيئة · 28‏/11‏/20141 دقائق للقراءة

Notice of Availability of the Environmental Assessment for the Proposed SunZia Southwest Transmission Project, New Mexico

ترجمة آلية محلية · اللغة الأصلية للمصدر

الملخص

Pursuant to the National Environmental Policy Act of 1969, as amended, the Bureau of Land Management (BLM) has prepared an Environmental Assessment (EA) to determine whether newly identified measures to mitigate potential impacts caused by the proposed SunZia Southwest Transmission Line Project to military operations and readiness activities require the BLM to prepare a supplement to the Final Environmental Impact Statement (EIS), which the BLM published in June 2013. The mitigation proposed by the Department of Defense (DOD) would involve the burial of three segments that total approximately 5 miles of the SunZia Southwest Transmission Line Project within the area identified as the "call up area" north of the White Sands Missile Range along and within the preferred alternative corridor analyzed in the Final EIS. This notice announces the opening of a public comment period for the EA.

اللغة الأصلية للمصدر: Federal Register — Interior Departmentافتح البيان الأصلي →

استكشف الموضوعات

تحليلات الأعمال →