BN Business News
أضف شركتك →
تجري حاليًا ترجمة هذا المقال. نعرض مؤقتًا النسخة الأصلية باللغة الإنجليزية.

التنظيم والقانون · 3‏/12‏/20072 دقائق للقراءة

National Capital Region; Notice of Intent To Prepare an Environmental Impact Statement

ترجمة آلية محلية · اللغة الأصلية للمصدر

الملخص

The National Park Service (NPS) announces its intention to prepare an Environmental Impact Statement (EIS) and to conduct scoping to analyze the impacts associated with a land exchange between Georgetown University (University) and the NPS and the impacts associated with the construction of a proposed boathouse for the University on a site within the Chesapeake and Ohio Canal National Historical Park (C&O Canal NHP). In 1995 the NPS conducted an Environmental Assessment (EA) on a proposed land exchange of the site owned by the University within the boundaries of the C&O Canal NHP). In 1995 the NPS conducted an Environmental Assessment (EA) on a proposed land exchange of the site owned by the University within the boundaries of the C&O Canal NHP and a site located within the non-motorized boathouse zone established by the Georgetown Waterfront Park Plan. This EA resulted in a Finding of No Significant Impact (FONSI). The three primary land use goals evaluated were: (1) Precluding development of a boathouse on the University's largely undisturbed inholding in the park with existing significant natural and cultural resources; (2) Extinguishing nearly a mile of private access over the

اللغة الأصلية للمصدر: Federal Register — All Documentsافتح البيان الأصلي →

استكشف الموضوعات

تحليلات الأعمال →