BN Business News
أضف شركتك →
تجري حاليًا ترجمة هذا المقال. نعرض مؤقتًا النسخة الأصلية باللغة الإنجليزية.

الطاقة والبيئة · 22‏/9‏/20061 دقائق للقراءة

Safety Evaluation Report for the Proposed American Centrifuge Plant in Piketon, OH, NUREG-1851; Notice of Availability

ترجمة آلية محلية · اللغة الأصلية للمصدر

الملخص

Notice is hereby given that the Nuclear Regulatory Commission (NRC) has issued a Safety Evaluation Report (SER) for the USEC Inc. (USEC) license application, dated August 23, 2004, and as revised, for the possession and use of source, byproduct, and special nuclear materials at its proposed American Centrifuge Plant (ACP) in Piketon, Ohio. The SER discusses the results of the safety review performed by NRC staff in the following areas: General information, organization and administration, Integrated Safety Analysis (ISA) and ISA Summary, radiation protection, nuclear criticality safety, chemical process safety, fire safety, emergency management, environmental protection, decommissioning, management measures, materials control and accountability, and physical protection. The NRC is planning to conduct a public meeting in Ohio to provide an overview of the staff's safety review and to address any comments or questions relating to the issuance of the SER.

اللغة الأصلية للمصدر: Federal Register — Nuclear Regulatory Commissionافتح البيان الأصلي →

استكشف الموضوعات

تحليلات الأعمال →