سوق العمل · 22/6/20071 دقائق للقراءة
Construction Records for Rigging Equipment; Extension of the Office of Management and Budget's (OMB) Approval of Information Collection (Paperwork) Requirements
ترجمة آلية محلية · اللغة الأصلية للمصدر
الملخص
OSHA solicits public comment concerning its proposal to extend OMB approval of the information collection requirements contained in paragraphs (b)(1), (b)(6)(i), (b)(6)(ii), (c)(15)(ii), (e)(1)(i), (ii), and (iii) and (f)(2) of the Rigging Equipment for Construction Standard (29 CFR 1926.251). These paragraphs require affixing identification tags or markings on rigging equipment, developing and maintaining inspection records, and retaining proof-testing certificates.