التجارة الدولية · 17/8/20041 دقائق للقراءة
Silicomanganese From Brazil: Extension of Time Limit for the Preliminary Results of the Antidumping Duty Administrative Review
ترجمة آلية محلية · اللغة الأصلية للمصدر
الملخص
The Department of Commerce is extending the time limit for the preliminary results of the administrative review of the antidumping duty order on silicomanganese from Brazil until November 30, 2004. This extension applies to the administrative review of Rio Doce Manganes S.A. (formerly SIBRA-Electrosiderurgica Brazileira S.A.), Companhia Paulista de Ferroligas, and Urucum Mineracao S.A. The period of review is December 1, 2002, through November 30, 2003.