BN Business News
أضف شركتك →
تجري حاليًا ترجمة هذا المقال. نعرض مؤقتًا النسخة الأصلية باللغة الإنجليزية.

التنظيم والقانون · 2‏/10‏/19981 دقائق للقراءة

Approval And Promulgation Of Implementation Plans Georgia: Approval of Revisions to the Georgia State Implementation Plan

ترجمة آلية محلية · اللغة الأصلية للمصدر

الملخص

On August 25, 1998, EPA published a direct final rule (63 FR 45172) approving, and an accompanying proposed rule (63 FR 45208) proposing to approve the Georgia Post 1996 Rate-of-Progress Plan (9 percent plan) which was submitted on November 15, 1993, and amended on June 17, 1996. As stated in the Federal Register document, if adverse or critical comments were received by September 24, 1998, timely notice of withdrawal would be published in the Federal Register. Therefore, due to receiving an adverse comment within the comment period, EPA is withdrawing the direct final rule and will address all public comments received in a subsequent final rule based on the proposed rule. EPA will not institute a second comment period on this document.

اللغة الأصلية للمصدر: Federal Register — All Documentsافتح البيان الأصلي →

استكشف الموضوعات

تحليلات الأعمال →