BN Business News
أضف شركتك →
تجري حاليًا ترجمة هذا المقال. نعرض مؤقتًا النسخة الأصلية باللغة الإنجليزية.

الطاقة والبيئة · 18‏/2‏/19941 دقائق للقراءة

Environmental Impact Statements and Regulations; Availability of EPA Comments

ترجمة آلية محلية · اللغة الأصلية للمصدر

الملخص

EPA had no objections to the action as proposed. ERP No. D-BPA-L08050-WA Rating EC2, Puget Power Northwest Washington Electric Transmission Project, Construction and Operation, Whatcom and Skagit Counties, WA. Summary: EPA had environmental concerns based on the project's impact on water quality and the lack of a monitoring program that would help to ensure compliance with state Water Quality Standards. ERP No. D-FHW-E40339-NC Rating EC2, NC-12 Replacement of Herbert C. Bonner Bridge (Bridge No. 11) over Oregon Inlet, Construction, Funding, Coast Guard Bridge Permit, Special-Use-Permit, Right-of-Way Permit, COE Section 10 and 404 Permits, Dare County, NC. Summary: EPA had environmental concerns regarding environmental risks during construction in the storm prone area and the potential loss of submerged aquatic vegetation habitat. EPA had requested further information on mitigation for wetland losses and the identification of specific BMPs to be designed into the project for nonpoint source pollution control. ERP No. D-NRC-G06008-LA Rating EC2, Claiborne Uranium Enrichment Center, Construction and Operation, (NUREG-1482), NPDES Permit and Licensing, Homer, Claiborne Parish, LA. Summ

اللغة الأصلية للمصدر: Federal Register — Environmental Protection Agencyافتح البيان الأصلي →

استكشف الموضوعات

تحليلات الأعمال →