BN Business News
أضف شركتك →
تجري حاليًا ترجمة هذا المقال. نعرض مؤقتًا النسخة الأصلية باللغة الإنجليزية.

الأعمال · 21‏/11‏/20121 دقائق للقراءة

Notice of Availability of a Final Tier 1 Environmental Impact Statement, for the Chicago, IL to St. Louis, MO High Speed Rail Corridor Program and Tier 2 Evaluation for the Springfield Rail Improvements Project

ترجمة آلية محلية · اللغة الأصلية للمصدر

الملخص

FRA is issuing this notice to advise the public that a Final Environmental Impact Statement (Final EIS) has been prepared for the Chicago, Illinois to St. Louis, Missouri High Speed Rail Corridor Program. The Final EIS includes a Tier 1 corridor evaluation for the Chicago, Illinois to St. Louis, Missouri high-speed rail corridor and a Tier 2 project-level evaluation for the portion of the high-speed rail corridor in Springfield, Illinois. FRA is the lead federal agency and the Illinois Department of Transportation (IDOT) is the joint-lead state agency for the environmental review process. IDOT proposes to improve high speed passenger rail service between Chicago, Illinois and St. Louis, Missouri, including the rail lines through Springfield, Illinois. The proposal includes the development of double track along the railroad corridor to improve high-speed passenger service reliability and safety, and to increase the number of trips between Chicago and St. Louis, as well as improvements to railroad crossings, signals, and stations. The Final EIS presents the Program's purpose and need, identifies all reasonable alternatives, describes the affected environment, analyzes the potential e

اللغة الأصلية للمصدر: Federal Register — Transportation Departmentافتح البيان الأصلي →

استكشف الموضوعات

تحليلات الأعمال →