BN Business News
أضف شركتك →
تجري حاليًا ترجمة هذا المقال. نعرض مؤقتًا النسخة الأصلية باللغة الإنجليزية.

الطاقة والبيئة · 17‏/12‏/20122 دقائق للقراءة

Amendments and Correction to Petitions for Waiver and Interim Waiver for Consumer Products and Commercial and Industrial Equipment

ترجمة آلية محلية · اللغة الأصلية للمصدر

الملخص

The U.S. Department of Energy ("DOE" or the "Department") proposes amendments and corrections to portions of its regulations governing petitions for waiver and interim waiver from DOE test procedures. In finalizing the March 7, 2011 final certification, compliance and enforcement rule for consumer products and commercial equipment, DOE inadvertently deleted language pertaining to petitions for waiver and interim waiver of DOE's test procedure requirements for consumer products. This notice addresses that error by proposing to restore, with minor amendments, the omitted text. DOE also proposes a process by which, within 60 days after DOE grants a waiver for a product employing a particular technology, other manufacturers of that product employing a technology or characteristic that results in the same need for a waiver would submit a petition for waiver. This process would ensure that manufacturers of similar products test and rate those products in a comparable manner. The proposed rule also sets forth a process for manufacturers to request rescission or modification of a waiver if they determine that the waiver is no longer needed, or for other appropriate reasons. DOE also propos

اللغة الأصلية للمصدر: Federal Register — Energy Departmentافتح البيان الأصلي →

استكشف الموضوعات

تحليلات الأعمال →