BN Business News
Ajouter votre entreprise →
Cette traduction est en cours de préparation. En attendant, nous affichons temporairement la version originale en anglais.

Entreprise · 01/07/20251 min de lecture

Repealing Certain Bridge Load Capacity Evaluation Requirements

Traduction automatique locale · Langue originale de la source

Résumé

FRA proposes to eliminate the Federal requirement that defines the process a track owner must follow when scheduling the evaluation of bridges with no load capacity determination. The requirement was intended as a transitional measure to phase in compliance after the bridge safety regulations became effective. The restrictions on the track owner's discretion to determine the process for evaluation of bridge load capacity are no longer necessary because the regulations have been in effect for almost fifteen years and the transitional period for compliance has ended.

Langue originale de la source: Federal Register — Transportation DepartmentOuvrir le communiqué original →

Explorer les analyses

Analyses business →