Énergie et environnement · 03/03/20261 min de lecture
Commission Information Collection Activities (FERC-725T, 725Z, 725L, 725G, 725A and 725X); Comment Request; Revision
Traduction automatique locale · Langue originale de la source
Résumé
In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the currently approved information collection, FERC-725T_BAL-001-TRE (Primary Frequency Response in the ERCOT Region), FERC-725Z_IRO-010-5 (Reliability Coordinator Data and information Specification and Collection), FERC- 725L_MOD-032-1 (Data for Power System Modeling and Analysis), FERC- 725G_PRC-012-2 (Remedial Action Schemes), FERC-725G_PRC-017-1 (Remedial Action Scheme Maintenance and Testing), FERC-725A_TOP-003-6.1 (Transmission Operator and Balancing Authority Data and Information Specification and Collection), FERC-725X_VAR-001-5 (Voltage and Reactive Control), FERC-725X_VAR-002-4.1 (Generator Operation for Maintaining Network Voltage Schedules) (Mandatory Reliability Standards for category 2 generator owners and generator operators). There are anticipated changes in the reporting requirements for this information collection for each of the eight standards. This order published for 60-day notice period on December 18, 2025, and received no comments.