BN Business News
Añadir empresa →
Esta traducción se está preparando. Mientras tanto, mostramos temporalmente la versión original en inglés.

Negocios · 20/6/20251 min de lectura

Notice of Final Nonavailability Waiver for the Alabama State Port Authority To Purchase Two Rubber-Tired Gantry Cranes

Traducción automática local · Idioma original de la fuente

Resumen

The Federal Railroad Administration (FRA) is issuing a waiver of its Buy America requirements to the Alabama State Port Authority (ASPA) for two rubber-tired gantry cranes for use in the Rail Expansion, Rehabilitation, and Modernization Project--Montgomery Intermodal Container Transfer Facility (Project). The Project received funds under the Fiscal Year 2022 Consolidated Rail Infrastructure and Safety Improvements (CRISI) program; therefore, FRA's Buy America requirements apply to the Project. The final waiver will apply to two rubber-tired gantry cranes based on the domestic nonavailability of the cranes. The final waiver will not apply to any construction materials, and therefore, FRA is not waiving any applicable requirements under the Build America, Buy America Act (BABA). A substantively identical Notice was placed on public inspection on January 21, 2025, but withdrawn before publication.

Idioma original de la fuente: Federal Register — Transportation DepartmentAbrir el comunicado original →