International trade · 07/05/2010Updated: 10/17/2026 · 1 min read
U.S. Extends Timeframe for Preliminary Results of Antidumping Investigation into Malaysian Polyethylene Bags
Summary
The U.S. Trade Representative's office has extended the deadline for preliminary results of an antidumping duty administrative review into polyethylene retail carrier bags imported from Malaysia, which was originally set to be completed by November 2023.