Considerations for Estimating Site-Specific Probable Maximum Precipitation at Nuclear Power Plants in the United States of America

The U.S. Nuclear Regulatory Commission (NRC) is issuing a knowledge management NUREG, NUREG/KM-0015, "Considerations for Estimating Site-Specific Probable Maximum Precipitation at Nuclear Power Plants in the United States of America." The NRC staff and Oak Ridge National Laboratory have prepared a reference document summarizing recent lessons-learned in connection with a review of the site-specific probable maximum precipitation (SSPMP) estimates used by some nuclear power plant owners and operators in connection with a recent re-evaluation of external flooding at their respective project sites.