Bezpieczeństwo i regulacje · 29.12.2015
Drawbridge Operation Regulation; Missouri River, Atchison, KS
The Coast Guard is changing the operating schedule that governs the Atchison Railroad Drawbridge, Mile 422.5, across the Missouri River at Atchison, KS. Under this rule the drawbridge will open on signal if at least a two-hour notification is given. This rule change allows the bridge to operate under the customary schedule that has been adopted by the waterway users.